CERTIFICATION GUIDE: TITLE 24

You don't choose Title 24. You choose how much it costs you.

Hero image: placeholder, not real yet

Every other certification on this site is a choice. Title 24 isn't. California's Building Energy Efficiency Standards, Part 6 of the California Code of Regulations, are mandatory for every new construction, addition, and major renovation project in the state. There's no version of "should we pursue Title 24." The only real question is which compliance path you take, and by how much margin you clear it, and both of those are decisions that get more expensive the later you make them.

Why getting it right is worth it: fact-checked, not generic

The right code cycle, automatically

2022 or 2025 Energy Code depends on your actual permit application date, not your design date: the 2025 code applies to permits submitted on or after January 1, 2026. Get this wrong and you're modeling against the wrong budget entirely.

TDV is gone: LSC changes what's cost-effective

The 2025 code replaces Time Dependent Valuation with Long-term System Cost, a 30-year lifecycle view. Heat pump and renewable-ready designs generally score better under LSC than they did under TDV: worth re-checking a design that penciled out under the old metric.

Above-code performance pays twice

Clear Title 24 with real margin and many California utilities already have a rebate program waiting for the same performance data your compliance model produces. Plus, for projects that broke ground before July 1, 2026, most of the inputs a 179D claim's ASHRAE 90.1 baseline comparison still needs.

Catch the fail before plan check does

16 California climate zones, each with its own energy budget that doesn't map onto national IECC/ASHRAE zones: a design that clears one CA zone comfortably can fail outright in another.

Sixteen zones, sixteen different budgets

Title 24 sets its energy budget by climate zone, and California has 16 of them. A design that clears code comfortably in one zone can fail outright in another, which means a statewide average number is close to useless for a specific project. Buildwiser runs your design against the actual budget for your site's climate zone, not a rounded statewide estimate.

Prescriptive or performance: pick the one that's actually cheaper

The prescriptive path is a fixed checklist: every system individually has to pass. The performance path models your whole building's energy budget together, letting a strength in one system offset a weakness in another: often cheaper, but it requires the full energy model that a prescriptive checklist doesn't. Buildwiser runs both against your design and tells you which one actually wins, instead of defaulting to whichever path your consultant is more comfortable modeling.

How much will it cost for your project to go Title 24?

Free directional numbers in minutes, run against your actual project.

Get my numbers

Solar and storage aren't an above-code extra anymore

The 2025 Energy Code updates requirements for buildings with photovoltaic systems to pair them with battery energy storage, with CEC-specified sizing rules aimed at enabling onsite use of clean energy while limiting grid export. For a California project, solar and battery sizing isn't a separate decision from Title 24 compliance anymore: it's part of how the 2025 code itself gets scored, and getting the pairing right affects both your compliance margin and your actual construction budget.

See how much solar will cost you on your project.

Run the numbers on your actual PV + battery sizing, free.

Try our calculator
A Title 24 rejection at plan check doesn't just cost the redesign. It costs every week the permit sits waiting behind it.

Catch the fail before plan check does

Illustrative modeling suggests projects that model compliance after entitlement spend $40K+ more on redesign, on average, than projects that model it before the unit mix locks. Title 24 also updates roughly every three years: which code cycle applies depends on your actual permit date, not your design start date, and getting that wrong is its own way to fail a review that should have passed.

  • Climate-zone-specific energy budget, not a statewide estimate
  • Both compliance paths modeled, so you know which one is actually cheaper
  • Correct code cycle matched automatically to your permit date
  • Re-run instantly on any design change, before it reaches plan check

How much will it cost for your project to go Title 24?

Find the fail while it's still cheap to fix.

Check my compliance